Week 1 of Waterbrook Remodel

binära optioner indikatorer ConstructionAtWBF_Aug2013It’s really a mistake to think the remodel project just began this week. The work has been discussed and planned behind the scenes for months. Even some of the prep work has been happening to the building for several weeks now. However, this was the week where the major labor happened! Outside construction crews, painters, and carpenters have been onsite doing the work that will be impossible to miss. We’ve planned out the project to be two weeks of major construction. Week 1 was the 507 building. Week 2 (to start Monday) is the 100 building.

opçőes binarias 30 segundos We’re transforming the 507 building into our new Children’s Ministry Center. The old house will still be home to our staff offices, but we’re changing all the other rooms to facilitate activity and teaching for elementary age children. Our WAVE ministry (Jr. High) gets to keep their Wave Room (garage). The finish out, decorating, detail work will continue on the 507 building next week while the construction crews begin work on transforming the 100 building space into something new as well. The crews, and our remodel coordinator Bert Schmeising, have kept their word thus far about making sure we have all rooms available for us on Sundays during this project. Bert rocks!

binäre option booster Here are a few pictures of the daily progress on the 507 building this week.

http://www.omod.no/?demobilizaciya=no-deposit-bonus-on-binary-option&6fd=81 no deposit bonus on binary option Day 1 (Monday) had crews framing out the porch. It will become the new check-in area.

http://www.ivst-vz.de/?debin=avatrade-kosten avatrade kosten Day 1 Front Porch 8-2013

Tastylia Strips 20mg Tadalafil Ghevarsha International Legal Supplier Day 2 – Sheet rock work done on inside walls. New glass doors added between the entrance and what had been the “Fireplace Room”.

http://posgrado.ipa.org.ar/?seyl=opzioni-binarie-con-stop-loss&7e3=be opzioni binarie con stop loss IMG_0536

la mejor estrategia de opciones binarias Day 3 – You’ll notice the fireplace is gone from the east wall. Also, Lisa’s office was finished (basically).

binaire opties traden IMG_2144

forex personalizzato on line Day 4 - New “child size” door was added to the front.

الشركات دراسة حالة IMG_2156

iq option options broker demo konto reset Day 5 – The new glass doors were installed at the new entrance.

binaire opties zwendel IMG_2160

guida al trading online per principianti  

piattaforma iq opion  

opções binarias demo account

apriconto trading on line Posted: August 9, 2013 
Filed under: construction, Pastor Jeff, Waterbrook Bible Fellowship
Tagged: , , , , ,
Comments: Leave a Comment

Speak Your Mind

http://irinakirilenko.com/?deribaska=60sekunden-trading-spiele&3e3=f7 60sekunden trading spiele Tell us what you're thinking...
and oh, if you want a pic to show with your comment, go get a gravatar!

*


two + 6 =

5 visitors online now
1 guests, 4 bots, 0 members
Max visitors today: 6 at 03:04 am UTC
This month: 89 at 05-23-2017 11:11 am UTC
This year: 89 at 05-23-2017 11:11 am UTC
All time: 139 at 07-25-2014 05:29 pm UTC
SEO Powered by Platinum SEO from Techblissonline